Some things you want to consider and do when adding over sub-floors include the following. make sure the sheetrock and tile are totally dry before laying the flooring. At that point, only the final woodwork and trim will need to be completed. The interior of the building should be dry and the temperature should be comfortable enough in which to work before, during and after the installation process.
 
 Strip the paint, wax oil, plaster, sheetrock mud, and any other materials and surface failings. You may have to grind a concrete floor with deep grit coat paper to work loose any loose concrete, dirt or other particles or contaminates ; then thoroughly vacuum or sweep. Before adding new hardwood flooring, any glues or adhesives must be removed.
 
 Subfloors and their accompanying systems should be structurally powerful, and they’ve got to be installed using the manufacturer’s requirements and recommendations. Warranties won’t cover Problems that come from inadequate or wrong substructures or incorrect installation of those substructures.
 
 It is intensely significant the work areas are completely dry. The inside walls ought to have a comparative humidity of 35-48% as needed by adhesive manufacturers and in addition be dry enough for painting before installation and maintained after installation is completed.
 
 With a concrete subfloor, it’s important that you initially check for dryness, then employ a typical rubber mat or taped plastic test ; then take off after 24 hours and check for any trace of moisture. Do not lay the flooring if there’s any moisture. A credible moisture detection process may be employed on all concrete subfloors. Administer a calcium chloride test to determine the moisture content of the subfloor. The moisture content shouldn’t be more than 10%, or 3 pounds per one thousand sq. feet of space. Do not install the flooring if it surpasses these boundaries. You can also do this with reclaimed wood floors
 
 The skin of the concrete subfloors must not be slick, and it’s got to be clean, level, durable and have adequate compression strength of at least 3,000 pounds per square in.. Take off sections that aren’t flat,eg those that may have waves or trowel marks. Eliminate any marks or waste by grinding or employing a leveling compound composed of latex. The subfloor flatness must be checked especially along the walls, and improved, if required. The products can be installed over dry, flat wood subfloors, such as plywood, in addition to the concrete subfloors. The thickness of the overlay material should have a total of 3 / 4″ of subfloor thickness if plywood is utilized as an overlay.
 
 The more moderen wood types of subfloors have to also be checked for moisture by utilizing a moisture meter. Subfloors which are composed of wood or plywood shouldn’t exceed a 12% moisture content or a 4% difference in moisture content between the flooring and subfloor. Buy reclaimed antique wood floors here.